Before you start

Assembly instructions and video's

On the link below you will find all assembly instructions per model.

Assembly instructions

Foundation

Everything starts with a foundation that is flat and level. If the foundation is not level, meaning you have to work with spacers, you will create an opening under the frame through which water can penetrate.

Concrete

If you intend to make us of a concrete surface, it is important that this is as smooth as possible to prevent water passing underneath as much as possible. Porous concrete, joints, etc. will not result in an absolute seal.

Foundation size

Anchoring

Our sheds have been tested for wind resistance. However, it goes without saying that it is important to ensure the anchoring is done correctly. We supply standard anchor bolts suitable for a concrete surface.

Note! These foundation tips are only suggestions and are not to be construed as technical advice. The customer is solely responsible for the provision of an appropriate foundation. We cannot be held liable for any damage caused by the shed either not being anchored or being insufficiently anchored.

Insulation

You can choose to insulate your shed, depending on the type of items you want to store in it. The roof comes insulated as standard, but the outer walls are not. You can place flexible 8 cm thick rockwool between the profiles. You can then neatly finish the inside with a Telluria inner wall.

Electricity

Holes are provided at various places in the profiles for feeding electricity provisions through. You must put the electricity provisions in place before starting the construction.

Electric connection

Garage

An electrical cable with a length of +/- 1 meter is attached to the motor of the gate. The customer must provide the further connection himself.

Transport damage

Damage caused during transport (packaging) must be mentioned on the delivery documents (CMR). In case of damage, take pictures before unpacking.

Storage of the pallet

Store the delivered pallet (unassembled construction) in a dry place (under a roof), leave the protective cover intact and preferably install it within 2 weeks.

Unpack

All elements are properly packaged and checked twice on damages. Telluria NV is not responsible for damage caused during unpacking or assembly. Unpacking the elements should be done by 2 people. Telluria NV is not responsible for damage caused during unpacking or assembly.

Assembly

You need to remove the metal flakes after assembling so they don’t rust.